Preparing for the next technical sprint

Autumn leaves on campus

Autumn has arrived

With the KIS Widget now configured, tested and implemented on the University of Kent course pages we are now doing some preparatory work for the next technical sprint at the beginning of November. One of the areas we will  turn our attention to is a proposed re-design of the way we present data to prospective students on-line. Staff in Enrolment Management Services have drafted enhanced and improved course pages and held discussions with other members of staff to fine tune these suggestions. Some of the changes are aesthetic or aimed at making the pages  more readable and accessible. Other changes present additional data or links to related data – such as student profiles and information about Open Days. The KIS Widget, of course, features too, under a Further Info tab. Angela Watson will bring these proposals to the next XCRI-CAP Implementation Group meeting on Monday so we can continue the discussion and make plans to implement the changes.

Although at times the amount of work needed to reach all our milestones has seemed daunting I think the project team has managed to remain positive and enthusiastic throughout. For me it seems like we are reaching a point of synergy between different strands of the project. All these strands are obviously concerned with getting essential information to prospective and existing students, whether through printed materials or through internal and external websites. We still have a way to go but I think it is fair to say that we have unravelled a rather confusing and convoluted ball of  information flows and now we are pulling them together in neat ordered lines towards our goal of an efficient and easy to use and re-use course data collection and publication suite.

However I do not want to sound complacent and previous experience has shown that until systems are released into the wild and used in earnest by experienced practicioners we will not be able to judge how succesful  we have been. There may still be one or two knots left from that ball of confusion.

On November 1st our team of developers will begin the next technical sprint. We have had a largish gap since the last chunk of development but will catch up with six 2 week sprints back to back. We have planned how we will use each of these sprints and aim to start with UI tweaks for the Programmes Plant and Load testing. Load testing is vital as we need to be confident that the application will retain good response times at those times of the year when the number of users which be much higher than normal. It is of course during these high pressure periods that the advantages the Programme Plant will bring will really prove their worth.

We will also use one of the upcoming sprints to create an inital XCRI feed and to test it against the validator. Now the Programmes Plant has reached its current stage we are reasonably confident that we can produce the XCRI feed without too much additional work but we don’t want to risk leaving this until the end of the project. Just in case.

Standard